Build#

Welcome to the build guide for Neptune's DIY kit. We hope you have a great time putting this module together and a wonderful time using it.

Please read all instructions thoroughly before starting. If you have questions or run into trouble please reach out to us on discord or drop us an email.

This is a beginner level kit. Some soldering experience is helpful but not required, though we recommend practicing on another project first. We also have some slightly easier kits available, such as our Helium kit. Even if you've got some experience, we recommend taking a look at Adafruit's guide to excellent soldering.

This build takes around one hour to complete.

Tools required#

Before you begin, make sure that you've got:

Flux

We suggest using solder with "no clean" flux. If you use a different kind of flux, be sure to carefully clean the flux residue off based on the guidelines provided by the manufacturer of your solder. Take special care with the LEDs and potentiometers, as they can be damaged by water and flux cleaners.

Kit contents#

Your kit should contain the following items. If any are missing please email us.

Mainboard Faceplate 1/8" jacks (8) Hex nuts for the 1/8" jacks (8) Eurorack power header Rubber bands (2) Big knob Small knobs (3) Tall trimmer pots (3) 9mm pots (4) Washers for 9mm pots (4) Nuts for 9mm pots (4)

Pot washers?

We typically screw the 9mm pot's washer and nut onto the shaft when packing kits so they don't get lost. You should remove them before you start the build!

Power header#

Your first task is to solder the 10-pin Eurorack power connector to the mainboard.

Power header and mainboard

The power connector goes on the back side of the board. When placing note the notch in the outline on the board. You'll need to make sure the slot on the connector matches where the notch is on the outline. The holes for the power connector are designed to be a tight fit, so make sure to push the header firmly flush against the board.

Once placed, make sure to push it flush against the board and then solder the 10 pins on the front side of the board.

Watch out for those LEDs!

Avoid touching the LEDs with your iron- they really don't like being melted and they're very hard to replace.

Pots and jacks#

Your next task is to put all of the jacks and pots into place. Don't solder these yet, as you'll use the faceplate to help you get everything aligned in the next step.

Stuffing

Fun fact, we call this process "stuffing"! It makes us think of Thanksgiving. 🦃

Start with the four 9mm pots. Place them onto upper area of mainboard in the spots labeled cutoff, reso, salt, and fm1. You may need to bend or straighten the mounting legs on the pots to get them in place.

Next up is the 3 Tall trimmer pots. Place these into the three spots in the middle of the mainboard labeled lp vol, hp vol, and fm2.

Finally, the 1/8" jacks. These go on the lower area of the mainboard in the spots labeled reso in, salt in, fm1 in, fm2 in, lp in, hp in, vol in, and out.

At this point you should have all the jacks and pots in place:

All things stuffed

Faceplate alignment#

Before you get down to soldering, your next task is to use the faceplate to make sure everything is aligned and hold it all in place while you work. Grab the faceplate and the two rubber bands and then carefully place the faceplate over the jacks and pots.

Take a moment to check that everything is aligned and flush, as it's much easier to fix now than later! Take the first rubber band and wrap it twice around the upper part of the module. Try to keep it in the same spot as the picture, since it'll make your life a little easier in the next step.

Now take the second rubber band and wrap it twice around the lower part of the module, once again, try to keep it in the same spot shown.

Now that everything is held in place, flip the module over. Double check that all the components are aligned, flush, and that the pins are sticking through all the gold pads.

Rubber banded

First soldering pass#

Now's the time to break out the soldering iron! Your next task is to solder the pots and jacks in place. While you can do all of the soldering in one pass, we recommend following this two pass approach since it gives you one last chance to double check everything before it becomes much harder to fix.

Look out below!

Be careful when soldering near Neptune's little surface mount components. Keep a close eye on your iron, as it's easy to accidentally angle it in a way that unintentionally hits one of the components.

Start by soldering just the large, oval pads for all of the pots:

Next, solder all the pins for the jacks that aren't obscured by the rubber band. You'll come back for the rest later.

Once done, your board should look like the image below:

Rubber banded

Take this last chance to double-check your work. If any of the jacks or pots aren't flush or if any of their little pins managed to bend and miss their holes, fix that now. Once you've completely soldered everything it'll be much harder to fix!

Second soldering pass#

With everything in place, you can remove the rubber bands and finish up soldering. Start by taking off the rubber bands and removing the faceplate:

Now you can go through and solder all of the remaining legs on the pots and jacks:

Once done, your board should look like the following pictures:

Hardware#

Your next task is to place the washers and nuts on the pots and jacks.

Hardware

Dressing

Fun fact, we call this process "dressing"! It's like putting fancy clothes on your module. 🤵‍♀️

Start with the four washers for the 9mm pots, placing a single washer on each pot shaft:

Once the washers are in place, place the four larger pot nuts onto the pot shafts and hand tighten them.

Finally, place the eight smaller jack nuts onto each jack and hand tighten them:

Once done, your module should look like the image below.

Hardware done

Knobs#

Your final task is to add the four knobs to the 9mm pots.

Knobs

Start by loosening the set screw on each of the knobs using a small flat head screwdriver.

Next, turn all of the 9mm pots fully counterclockwise. Place the large knob on the top right shaft with the indicator line at the 7 o' clock position. Tighten the set screw to secure the knob in place.

Do the same for the remaining three small knobs.

Finished#

Congrats, you finished building your very own Neptune!

Completed module

Don't forget to go check out the User's Guide. We'd love to see your work, feel free to tag us on social media - we're @wntrblm on both Twitter and Instagram.

If you have any feedback or ran into any issues, feel free to drop us an email at support@winterbloom.com or file a issue on GitHub.